Project desk
Global application inquiries
Monday–Friday, 09:00–17:00 local desk time
Questions are welcome
A model name helps. A load list, AC system, battery plan, installation environment and destination market help much more today.

Global application inquiries
Monday–Friday, 09:00–17:00 local desk time
[email protected]
Include destination country in the subject.
+1 000 000 0000
Technical confirmation follows in writing.
LinkedIn · YouTube
Use official channels for published documentation.

Prepare the handoff
Continuous load describes steady duty, while pumps, compressors and transformers may add a short starting demand. Battery voltage alone does not establish compatibility; chemistry, current limits, battery-management communication and the current approved-device list can affect the combination. Placement changes the enclosure, heat-rejection and ingress-protection discussion.
For a grid-connected project, include the utility context and exact destination. Grid settings, protection requirements and conformity documents can vary by market and model. If a requirement remains unknown, label it as unknown. The advisor can identify the document, measurement or qualified project role needed to resolve it.
We organize the inquiry and identify missing selection inputs. A response may request a load schedule, single-line diagram or battery model reference. Any shortlist remains conditional on the current datasheet, installation manual, compatibility documentation and local design approval. Price and availability depend on model, quantity, destination and commercial terms.
Do not send passwords, private monitoring credentials or energized-work instructions through this form. Fault-code questions should include the exact model, displayed code and safe observations. Troubleshooting on energized equipment must be handled by a qualified person following the applicable manual and lockout procedures.